Concrete, Screed & Mortar Calculator

Volume of a slab, floor or post footing and the bags of premix – or cement, gravel and water to mix concrete, screed or mortar yourself.

Runs locally in your browser
Material
Shape
Volume needed
0.990 m³
0.900 m³ net
Premix · 55 bags of 40 kg2,178 kg

Mix it yourself

Cement · 12 × 25 kg297 kg
Gravel 0/16 · ≈ 1.18 m³1,881 kg
Water163 l

Guide values: concrete about C20/25, screed 1 : 4 cement to sand by weight. Follow the instructions on the bag; for load-bearing parts ask a structural engineer.

About this tool

Whether it is a slab for the garden shed, post footings for the fence or new screed in the bathroom: first you need the volume, then the amount of material. The calculator works out the volume from a slab, an area, round holes or a direct value, adds an extra and turns it into bags of premix.

If you mix yourself, you also see cement in 25 kg bags, gravel or sand in kg and as loose volume in m³, plus the mixing water. The values are guide values for typical mixes: concrete about C20/25 with gravel 0/16, cement screed 1 : 4 with sand 0/8, masonry mortar with sand 0/4. Everything is calculated in your browser.

How it works

  1. Choose concrete, screed or mortar and the shape: slab, area, round or volume.
  2. Enter the dimensions – thickness and diameter in cm, lengths and depths in m – and the count for several identical parts.
  3. Read the volume, the bags of premix or the amounts to mix yourself, and adjust the extra and bag size.

Frequently asked questions

How many bags of concrete do I need for a cubic metre?

A 40 kg bag of premixed concrete yields about 18 litres. One m³ therefore needs about 2,200 kg, or 55 bags of 40 kg. From about 1 m³ on, ready-mixed concrete from a plant is often worth it.

How much screed do I need per square metre?

Premixed cement screed needs about 20 kg per m² and cm of thickness. A 5 cm screed on 20 m² is about 2,000 kg plus the extra.

Which mix ratio does the calculator use?

For concrete about 300 kg cement, 1,900 kg gravel 0/16 and 165 l water per m³, for screed 400 kg cement to 1,600 kg sand (1 : 4 by weight) and 200 l water, for mortar 300 kg cement to 1,500 kg sand. These are guide values – the cement manufacturer’s instructions take precedence.

How do I calculate a post footing?

Choose “Round”, enter the diameter in cm and the depth in m, and set the number of footings. For square footings use “Slab” with the depth as thickness in cm.

What about the floor on top?

Calculate tiles or laminate on the screed with the Tile & Flooring Calculator, the stairs to the upper floor with the Stair Calculator.